back
TF8 - Field test on 150 kV Multi-Microgrid - blackstart and reconnection (ELTRA)
In this field test ELTRA will "simulate" the situation where a DNO has the responsibility for operating a 150 kV Multi-Microgrid. The test will be divided in the following phases:
- Describe all elements in a specific Multi-Microgrid:
Load, Lines, substations, CHP units, Wind turbines, reactive resources etc.
- Establish a computer model for the Multi-Microgrid
- Establish the forecasting functions: Load and production
- Establish the normal Eltra security functions (based on loadflow calculations)
- Simulate the operation in the Multi-Microgrid
- Evaluate the simulations against measurements
- Describe the Multi-Microgrid ability to balance the active and reactive power
- Describe the Multi-Microgrid ability to blackstart and reconnect to the main grid